Syracuse University – Heroy Hall

IPD completed multiple labs at Heroy Hall including a Paleoclimate research lab, sample preparation lab, as well as two Class 1000 clean room facilities for Geochemistry research. These spaces were designed to prevent contamination by way of precision controlled air with HEPA filtration, non-metallic ducts, clean power (via isolation transformers), and sealed LED lighting fixtures.

Additional upgrades included base cabinets with integral sinks; compressed air, water, and sanitary drain connections to equipment; supplemental HVAC cooling equipment; overhead power; and MEP and fire alarm system upgrades.

Return to Industry Portfolio