Rome Memorial Hospital

IPD was hired to install (4) 65kW Capstone Microturbines both electrically to the hospital’s emergency power system and thermally to the hospitals hot water reheat system. The system was right-sized to run at or near full capacity 24/7/365 to ensure the shortest possible pay back. The system has been a tremendous success in the eyes of the owner, NYSERDA, and by Capstone Turbine Corporation, who has conducted many tours of the plant to showcase how successful these systems can be. The combination of new energy equipment and the CHP system keeps RMH lean from an energy cost standpoint, allowing them to invest more heavily in their core business.


Return to Industry Portfolio